Well here we are back in the some what warm St. George, UT area. We started out our work trip in Twin Falls, ID replacing two heat exchangers that had gone bad. After that we headed north to Kent, WA where we installed the coping, tile, and the equipment at the Hampton Inn & Suites we have been working on. All that is left to do is plaster, and then start it up. :)
We then drove over to Federal Way, WA to check on another Hampton Inn & Suites we are supposed to start. They are about 2-weeks behind schedule so it looks like we will be starting sometime in the middle of January 2010.
From there it was on to Spokane, WA to drop off our trailer full of equipment and pipe. That is our next hotel pool to start on. We are waiting for the permit from the local and state health dept. Oh what a fun time they are. Haha.
Hmmm the next stop was to be Helena, MT but due to the weather and the high temperature of the day was below zero, everybody has pulled off for some time. We will get back up there to lay the pool/spa out so the excavator can get it dug. That is looking more like the end of December before that gets going.
Well there ya have it.... I do hope that everybody has had a good Thanksgiving and will be having a great Christmas and Happy New Year! :)